Existing process
Volumetric flow quoted in m³/min or cfm is meaningless until the bidder states the inlet temperature, inlet pressure, and gas molecular weight used for that figure. Nominal power in kW or hp must sit next to the same duty, not a family range endpoint.
Ask every bidder to keep inlet conditions, discharge pressure, and measured package power on one comparison row so a replacement does not inherit an unmatched duty.